PROJECT REFERENCES - OIL & GAS - FOOD PROCESSING

ACTEMIUM OIL&GAS SYSTEMS INDONESIA
EXECUTION PERIOD
PROJECT NAME
TYPE
END USER
WORK CAPACITY
2015-2016
PIPELINE GRESIK-SEMARANG - control systems and telemetry SCADA
Control System and SCADA
PERTAMINA GAS
Integrated Process Control System - Emergency Shutdown System and Fire Gas System (SIL2) & SCADA at GRESIK station, Control & Safety System & SCADA at SEMARANG Station and 17 x SCADA RTU at LBCV stations along the pipeline. Up to install & commisisoning
2015-2016
CHEVRON - BANGKA TOP SIDE FPU - Control & Safety Systems
Process Control system, Safety Shutdown systems (ESD - Fire & Gas automated system)
CHEVRON INDONESIA COMPANY
Control and Safety Systems (SIL2) for new process modules and modifications & tie-ins at existing West Seno FPU offshore complex. 520 I//O and modifications & merging with existing facilities
2015-2017
BADAMYAR PROJECT - TICSS
PCS, ESD and F&G Systems Integration
TOTAL E&P MYANMAR
Control and Safety Systems (SIL3), Telecommunication Systems, Instrument Power Distribution for 1 new Low Compression Platform LCP) and 1 new WellHead Plateform (WP4) (systems in gas zone 2) as well as Systems Upgrades and process modifications in existing 4 Platforms (QP2, PP, MCP, WP1) at the Offshore Oil&Gas complex of YADANA.
1856 new hardwired I/Os + existing upgrades,
14 telecom systems,
424 engineering documents.
2014-2015
MAHARAJA LELA SOUTH PROJECT
PCS, ESD and F&G Systems Integration Telecom Integration
TOTAL E&P BORNEO
Offshore : 1354 hardwired IO, hazardous area, outdoor ATEX
Onshore: 476 hardwired I/Os
certified systems , telemetry interfaces onshore/offshore.
Telecommunication systems / radio telemetry LOS/UHF, beacons, IP telephony, IP cameras, LAN/WAN etc...
Systems, installation and commissioning.
411 engineering documents
2014-2015
KL GAS LIFT COMPRESSOR PROJECT
PCS, ESS and Fire & Gas Systems (new and modifications)
PERTAMINA HULU ENERGY / ONWJ
Control , safety Systems, Fire and Gas Systems integration (Allen Bradley PCS and SIL2 SSS-FGS) for 2 compression platofrms . FAT-IFAT, Telemetry IFAT (~>450 IOs), engineering systems installation & commmissioning
2014-2015
UPGRADING SYSTEMS BALONGAN
E&I and PCS-ESD upggrade EPCC
PERTAMINA EP
Upgrading control and safety systems, instrumentation & electricity at crude oil Terminal Balongan, Booster Cemara Utara, Booster Cilamaya and Booster Tegal Gede,. Control Room Building construction, engineering, systems, installation, commissioning and Operation Assistance
2013-2014
South Mahakam Phase 3
Control , Safety and Fire and Gas Systems Integration Telecom Integration
TOTAL E&P INDONESIE
Control and safaty stems (DCS onshore/PLC offshore (hazardous area) and modiications of existing facitlities
Telemetry & Telecom systems integration (6 systems)
Electrical systems (ATEX zone 2)
>289 engineering documents; ~ 1030 hardwired IO
Systems, Installation, commissioning
2013-2014
AGX - Interactive Operating Manuals
Operating Manuals c/w Interactivity
PREMIER OIL NATUNA BV
31 book1 - process description, sections engineering
31 book2 - operating procedures, sections engineering
Interactive software programming and integration of the above
2011
ANOA PHASE 4 AGX COMPRESSION CONFIGURATION
Control & ESD and Fire & Gas Systems Integration
PREMIER OIL NATUNA SEA BV
60 Engineering documents
+/- 500 Hardwired I/O Software Configuration & Syst Upgrades
Software programming and integration and Tie-ins with existing Systems, installation, commissioning
2012-2013
ATTAKA offshore platforms Control and Safety systems upgrades
Control and ESD and Fire & Gas Systems and E&I Upgrades without Plant Shutdown
CHEVRON INDONESIA Co.
Control & Safety systrems revamping & replacement & hot transfer and commissioning, during Plant Operation without Plant Shutdown
1084 hardwired I/O software configuration, 300 engineering document
152 field instruments, 39 F&G instruments EP installation & C.
Engineering, Systems, Installation, Commisisoning, Operation assistance - no Plant Shutdown
2012
RUBY TIE-IN
SIS
PEARL OIL
92 Engineering Documentts
+/- 350 Hardwired I/O Software Configuration
Software programming and integration of the above
Systems, installation, commissioning
2013
ZAWTIKA - TPS2
Control & ESD amd Fire and Gas Systems Integration
PTTEP
Control and ESD-F&G systems (onshore c/w interface tie-ins to existing facilitiuties at MS and PLC stations).
Systems, installation, commissioning
2013
MSF2 - DIESEL ENGINE GENERATOR & FIRE WATER PUMP UNIT CONTROL PANELS
Package control and safety systems UCP
PT NAVITAS
Control & Safety system - atex zone 2 c/w supervisory- 140 Ios
Systems, installation, commissioning
2012-2014
YADANA YSP & OCSU
Control & ESD and Fire and Gas Systems Revamping & interfaces tie-ins
TOTAL E&P MYANMAR
>800 engineering documents
Transfer of the control room for re-location of the Living Quarter Platform (control & sfatey systems, telecom system) during Plant Operations
7 Control & Telecom systems revamping without plant shutdown or limited duration refurbishing & commissioning activities.
Systems, installation, commissioning
2012-2013
SISI NUBI2/PECIKO7B
Control , ESD and Fire and Gas systems Integration (onshore / offshore)
TOTAL E&P INDONESIE
150 engineering documents
+/- 500 hardwired IO per system (x2) per platform (x 3)
System staging, programming and integration of the above;
Installation, commissioning
2012
KAKAP KF Booster Compressor Platform
Control & safety systems Integration Modification Tie-ins
STAR ENERGY
35 Engineering documents
+/- 350 hardwired I/O software configuration and Modification in existing
Software programming, Integration and Tie-ins
2010-2012
SOUTH MAHAKAM PH1&2
SIS
TOTAL E&P INDONESIE
>650 engineering documents (System, Telecom, Elec);
+/- 2700 hardwired IO software configuration
2011
VTIS
Telecom Integration
TOTAL BALIKPAPAN
Engineering, installation ans commisioning
2011
SMK operating manuals
Engineering and programming
TOTAL E&P INDONESIE
114 book1 - process description, sections engineering
63 book2 - operating procedures, sections engineering
Interactive software programming and integration of the above
2010
RASLAFFAN BERTH 1A/1B
S/T PROGRAMMING
QATAR PETROLEUM
400 hardwired I/O software configuration
2009-2010
BONGKOT4
ICSS
PTTEP
210 Engineering documents (system & fuctional analysis)
4500 hardwired I/O software configuration
2010
PECIKO LONG TERM STUDY
ENGINEERING
TOTAL E&P INDONESIE
Basic engineering
2008-2010
TUNU13
Process Control system, ESD, Fire and Gas systems, Electrical Telecom systems
TOTAL E&P INDONESIE
378 engineering documents (system, telecom, elec);
900 hardwired I/O software configuration;
Engineering, Systems,. Installation and Commissioning
2009-2011
OML58-SSS PROG
S/T PROGRAMMING
TOTAL UPSTREAM NIGERIA
1500 SSS hardwired I/O software configuration
Systems, commissioning
2009-2010
OML58-LCS
ESD / F&G SYSTEM
TOTAL UPSTREAM NIGERIA
21 engineering documents;
523 hardwired I/O software configuration
Engineering, systems, installation and commissioning
2009
MCP INTOOLS MIGRATION
S/T PROGRAMMING
TOTAL E&P MYANMAR
-
2009
KHARIYAGA PH3
S/T PROGRAMMING
TOTAL E&P RUSSIA
400 hardwired I/O software configuration
Programming and commissioning
2008-2011
PECIKO6 / EPSC2
PCS, ESD , Fire and Gas Systems, Telecom systems, E&I
TOTAL E&P INDONESIE
417 engineering documents (system & telecommunication);
1195 hardwired I/O software configuration
Engineering, systems, installation and commissioning
2007-2009
PECIKO5
PCS, ESD, Fire and Gas systems, Telecom & Electtrical Systems
TOTAL E&P INDONESIE
120 engineering documents (system, telecom, elec);
670 hardwired I/O software configuration
Engineering, systems, installation and commissioniong
2007-2009
TUNU12
Telecom, ICSS, Elec.
TOTAL E&P INDONESIE
471 engineering documents (system, telecom, elec),
1350 hardwired I/O software configuration.
Engineering, systems, installation , commissioning
2008
BONGKOT 3F
PCS / ESD / F&G
PTTEP
41 engineering documents (system),
990 hardwired I/O software configuration
Configuration and commissioning
2006-2007
YADANA MCP
PCS system, ESD system, Fire and Gas system, telecom systems, electrical systems
TOTAL E&P MYANMAR
180 engineering documents (system & telecom) and software configuration
Engineering, systems, installation and commissioning
2006-2007
TUNU & SISI NUBI OPERATING MANUALUALS
ENGINEERING & IT
TOTAL E&P INDONESIE - BKPN
216 process chapters ; 200 operguide chapters, 7 000 links interactivity
2007-2008
AKPO FPSO SSS
S/T PROGRAMMING
TOTAL UPSTREAM NIGERIA
6000 SSS hardwired I/O software configuration and 20 functional analysis engineering documents
Engineering and commissioning
2007
BONGKOT 3E
PCS / ESD / F&G System
PTTEP
45 engineering documents (system),
1485 hardwired I/O software configuration
Systems, installation, commissioning
2006
REBOILER MODIF
SIS
KUFPEC INDONESIA
200 I/O and mimic dipsplay reconfiguration
Engineering, systems, installation, commissioning
2005
CPU F&G REVAMP
SIS
TOTAL E&P INDONESIE
Revamping obsolete Fire & Gas detectors including modification in Triconex (SSS) and Honeywell (PCS)
2003-2005
PECIKO4 / EPSC1 & EPSC3
PCS, ESD, Fire and Gas systems, Telecom & Electtrical Systems
TOTAL E&P INDONESIE
540 hardwired I/O software configuration for PCS
840 hardwired I/O software configuration for SSS
Engineering, systems, installation and commissioniong
2001-2003
PECIKO3 / EPSC1
PCS, ESD, Fire and Gas systems, Telecom & Electtrical Systems
TOTAL E&P INDONESIE
300 hardwired I/O software configuration for PCS
800 hardwired I/O software configuration for SSS
Engineering, systems, installation and commissioniong

 

ACTEMIUM INDUSTRIAL SYSTEMS INDONESIA
EXECUTION PERIOD
PROJECT NAME
TYPE
END USER
WORK CAPACITY
2015
Premix line - Pasuruan / Surabaya
PLC - MES - Electricity and installation
NUTRECO PASURUAN
Supply LV-MDP panel, MCC form 2 panel and standard MCC panel, PLC panel with Inter-rack for remote I/O.
Cable Trays, Cables and Electrical installation.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
 
760 I/O with Remote racks, 10 Weighing system from PLC
2015
3 x Premix lines - Xiangtan
PLC - MES - Electricity and installation
NUTRECO XIANGTAN
Supply, MCC panel for PX and YAF line and revamping MCC panel for FM line. and PLC panel with Inter-rack for remote I/O.
Electrical Supervisor for installation by local contractor.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
 
2128 I/O with Remote racks, 8 Weighing system from PLC
2014-2015
SPF Thailand - new storage & Reactor
PLC-MES
SPF THAILAND
Automation, PLC - SCADA for Petfood Palatability process.
Engineering, software programming, installation and commissioning
The Palatability process is coming from fish and using Reactor system. The system controls the CIP and the cooling tower.
736 I/O with 5 Weighing system from PLC
2014-2015
EULIFEED - cattle feed
PLC-MES
EULIFEED
PLC Cabinets to be connect with MCC panels from customer.
Feed mill process from Intake to Finished Good Bins, Control of Grinder, Mixer, Liquid and Pellet mill.
Data Management System for interface with SCADA and ERP System.
1200 I/O with Remote racks, 3 Weighing system from PLC
2014-2015
GOLDCOIN Surabaya - PLC revamping
PLC-MES
GOLDCOIN SURABAYA
Automation, SCADA, Data Management systems retrofit and transfer during production of the existing plant- Feedmill plant of capacity 15 T/H - engineering design procurement installation , commissioning, installation pre-commissioning and commissioning. Data Management System for interface with SCADA for Intake, Grinder, Batching computer.
200 I/O PLC
2014-2015
PFMC Manila revamping
PLC-MES
PFMC
Automation, SCADA, Data Management systems retrofit and transfer during production of the existing plant- Aqua Feed plant of capacity 15 T/H - engineering design procurement installation , commissioning, installation pre-commissioning and commissioning.
Data Management System for interface with SCADA for Intake, Grinder, Batching computer.
700 I/O PLC (3 x Siemens)
2014
WONOKOYO Feedmil extension
PLC-MES
PT WONOKOYO
Automation, SCADA, Data Management systems retrofit and transfer during production of the existing plant- Feedmill plant of capacity 15 T/H - engineering design procurement installation , commissioning, installation pre-commissioning and commissioning.
Data Management System for interface with SCADA for Intake, Grinder, Batching computer.
320 I/O PLC
2014-2015
CP BATAAN
PLC-MES
CHAROEN POKPHAND
Automation, PLC - MES for CP Bataan Feedmmill of capacity 30 T/h for Fish and Shrimp : engineering, software programming, installation and commissioning.
The process for Aqua Feed Plant includes receiving Raw Materials, Storage, grinding, Batching system with dosing scales, Mixing with liquid aditives. For Shrimp line, the process will use Pellet mill then dryer, cooling process then crumbler system (depend of formula) to Finished Product Bins. For Fish line, the process will use Extruder then dryer, cooling process then crumbler system (depend of formula) to Finished Product Bins
This factory has 2 lines : Shrimp and Fish line.
Data Management System for interface with SCADA for Intake computer, Grinding computer, Mixers computer, pellet line computer, extruder line computer, liquid system,
5 500 I/O - Siemens S7-300 PLC (5x) with remote STB I/O,
2014
CP Hai Duong- Bredol system
PLC-MES
CHAROEN POKPHAND
Additional Liquid system included MCC and PLC panel.
Interface with the main control system.
64 I/O PLC
2014
PROCONCO Dinh Vu
PLC-MES
PROCONCO VIETNAM
Interfacing with new Intake system for Raw Material Bulk storage to transfer to the main Dosing Bins with 2 online scales, interfacing with Main system to access to the Database for Raw Material code and Stock.
Mainly commissioning remotely 
2013
CP Bangladesh - Bredol system
PLC-MES
CHAROEN POKPHAND
Additional Liquid system included MCC and PLC panel.
Interface with the main control system. 
64 I/O PLC
2013
COBRA - Cocoa Plant - Makasar
Electrical design - E&I installation, pre-commissioniing, commissioning
BARRY CALLEBAUT
New Cocoa bean processing plant in Makassar. (shell Silo, Intake, Cleaning, Blender, alkalizer, Roaster, cooler, grinding & refining, butter mass reshaping, moulding, tempering, boiler, potash preparation, compressor, diesel generator, chiller/cooler, utilities )
Electrical sizing engineering, supply and installation of MV, transformers, LV power distribution . Site installation of instrumentation and electrical works, pre-commissioning, commissioniing. 
Connection to PLN, MV(630A; 24kV), 1800 kVA transformation, Capacitor banks, LV-ACB (3200A), TGBT1, TGBT1,1 ~ 100 feeders& motors; local insrumentation, 20km cables, ~200 harwired IO + remote IOs (Siemens S7 PLC)
2012-2013
CP Bangladesh-Feedmiill
PLC-MES
CHAROEN POKPHAND
Feedmill of capacity of 75 TPH Poultry.
PLC Cabinets to be connect with MCC panels from customer.
Feed mill process from Intake to Finished Good Bins, Control of Grinder, Mixer, Liquid and Pellet mill. Engineering, software programming, panels manufacturing, installation and commissioning.
Data Management System for interface with SCADA and ERP System.
4500 I/O with Remote STB I/O (42 modules), 10 Weighing system from PLC
2012-2013
CP Bangladesh-Feedmiill
PLC-MES
CHAROEN POKPHAND
Feedmill of capacity of 85 TPH Poultry and 50 TPH Pigs
PLC Cabinets to be connect with MCC panels from customer.
Feed mill process from Intake to Finished Good Bins, Control of Grinder, Mixer, Liquid and Pellet mill. Engineering, software programming, panels manufacturing, installation and commissioning.
Data Management System for interface with SCADA and ERP System.
6300 I/O with Remote STB I/O (56 modules), 20 Weighing system from PLC
2012-2013
PT WIRIFA Feedmill & AquaFeed
PLC-MES - MCC
E&I installation
PT WIRIFA / EVIALIS SURABAYA
Supply MCC panel for Poultry and Aqua feed line, PLC panel with Inter-rack for remote I/O. Cable Trays, Cables and Electrical installation.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
1400 I/O with Remote racks, 10 Weighing systems from PLC
2012-2013
CP Aqua Ban Pru
PLC-MES
CHAROEN POKPHAND
Automation - SCADA system for 7 Pellet lines with crumbler and packing system.
Engineering, software programming and commissioning
1200 I/O with remote IO system
2012
EJK-PREP
PLC-MES
PT CITRA FeedMill / EVIALIS
Automation, SCADA, Data Management systems retrofit and transfer during production of the existing plant- Feedmill plant of capacity 15 T/H - engineering design procurement installation , commissioning, installation pre-commissioning and commissioning.
Data Management System for interface with SCADA for Intake, Grinder, Batching computer.
320 I/O PLC
2012
Mash Line Bulacan
PLC-MES
BOUNTY FARM
Supply MCC and PLC panel for Mash line with Automation - SCADA - Data Management, Include Engineering, software programming and commissioning
320 I/O PLC
2012
Mash Line Cebu
PLC-MES
BOUNTY FARM
Supply MCC and PLC panel for Mash line with Automation - SCADA - Data Management, Include Engineering, software programming and commissioning
320 I/O PLC
2012
EBD1 line 1 & Pellet line
PLC-MES
OCIALIS GUYOMARCH / EVIALIS
Installation of PLC system to control the production line and the Pellet line.
Data Management to interface with SCADA and ERP System
700 I/O PLC
2011-2012
PROVIMI Ganyu Feed
PLC-MES
PROVIMI NANNING
Supply, MCC panel for Premix and Completed Feeds line and PLC panel with Inter-rack for remote I/O.
Electrical Supervisor for installation by local contractor.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
 
1500 I/O with Remote racks, 7 Weighing system from PLC
2011-2012
PELLET Machine
PLC-MES
PILMICO
Supply PLC system and control System for the Pellet machine.
Engineering, PLC programming and commissioning
120 I/O PLC
2011-2012
Evialis Dong Thap Vietnam
PLC-MES
OCIALIS GUYOMARCH/ EVIALIS
Supply PLC panel for Feed mill line 15 TPH.
Engineering, PLC programming and commissioning
Data Management System for interface with SCADA and ERP System.
900 I/O with Remote racks, 3Weighing system from PLC
2011
PREMIX Deija
PLC-MES - E&I
TROUW NUTRITION INDONESIA
Supply MCC panel for Premix line and PLC panel with Inter-rack for remote I/O.
Electrical Supervisor for installation by local contractor.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
350 I/O with Remote racks, 3Weighing system from PLC
2011
SIERAD Interface with bredol
PLC-MES
PT JUTARASA ABADI
Additional Liquid system included PLC panel.
Interface with the main control system.
64 I/O PLC
2010
KEYLINK
PLC-SCADA
SIME DARBI CHINA
Chemical process in ATEX area for Grinding system and cleaning process.
Engineering, PLC and SCADA programming, commissioning
 
200 I/O PLC
2010
MOVEX EXCHANGE
MES
TNI
Interfacing with ERP System (M3) for Production Order, Stock, and Production consumption.
Trial platform before go live
2010
PLT2PBH
PLC-SCADA
STOLZ
Supply PLC system and control System for the Pellet machine and new pellet line
Engineering, PLC programming and commissioning
 
160 I/O PLC
2010
PREMIX PLANT
PLC-MES
NUTRECO
Supply MCC panel for Premix line and PLC panel with Inter-rack for remote I/O.
Electrical Supervisor for installation by local contractor.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
 
350 I/O with Remote racks, 3Weighing system from PLC
2008-2009
EVIALIS
PLC-MES
EVIALIS BINH DUONG
Supply PLC panel with Inter-rack for remote I/O.
Platform scale for Premix preparation dosing, Sticker Printer and scanners.
Data Management System for interface with SCADA and ERP System.
 
350 I/O PLC, 3Weighing system from PLC
2009
RICOR
PLC-MES
STOLZ ASIA
Supply MCC panel for Feedmill line and PLC panel with Inter-rack for remote I/O.
Electrical Supervisor for installation by local contractor.
Data Management System for interface with SCADA and ERP System.
900 I/O PLC, 3Weighing system from PLC
2009
SPF THAILAND
PLC-SCADA
SPF DIANA THAILAND
Automation, PLC - SCADA for Petfood Palatability process.
Engineering, software programming, installation and commissioning
The Palatability process is coming from fish and using Reactor system. The system controls the CIP and the cooling tower.
736 I/O with 5 Weighing system from PLC
2008-2009
TROUW NUTRITION
PLC-MES
TNI INDONESIA
Modification at the PREMIX line with additional Mixer and micro-dosing system
2008-2009
INOZA
PLC-MES
INOZA
Supply PLC equipment to be assembling with the MCC panel from the customer.
Feedmill capacity 45 TPH.
Engineering, PLC programming and commissioning
Data Management System for interface with SCADA
1200 I/O PLC
2008-2009
SIERAD
PLC-MES
PT SIERAD BALARAJA
Revamping Batching System with new PLC control panel.
Engineering, PLC programming and commissioning
Data Management System for interface with SCADA
320 I/O PLC
2008-2009
SANOVI AVENTIS
PLC-SCADA
STOLZ MIRAS
Pharmaceutical for Syrup process with CIP
Engineering, PLC programming, Commissioning.
 240 I/O PLC
2008-2009
F.F.S
PLC-SCADA
BOUNTY FARMS
Automation and SCADA system included PLC equipment for Full Fat Soya process.
Engineering, Software Programming, commissioning.
400 I/O PLC
2008-2009
PROCONCO BH
PLC-SCADA
PROCONCO VIETNAM
Supply PLC system and control System for the Pellet machine and new pellet line
Engineering, PLC programming and commissioning
160 I/O PLC
2008-2009
PROCONCO DV
PLC-SCADA
PROCONCO VIETNAM
Supply PLC system and control System for the Pellet machine and new pellet line
Engineering, PLC programming and commissioning
160 I/O PLC
2008-2009
STOLZ CTID
PLC-SCADA
ERESIS
Supply PLC system and control System for the Pellet machine.
Engineering, PLC programming and commissioning  
160 I/O PLC

 

 
 